Harbor Point (second example) / Preconstruction-to-field handoff
Not released

WP-E-04 · East corridor electrical reroute

One impacted package, with the exact hold points preventing release.

View source lineage

Package controls

Blocked
LocationEast corridor · E4-E6
Controlling revisionA3 / Addendum 2
Trade / ownerElectrical · Eli Brooks
MaterialConduit + supports · verify route
Crew releaseNot authorized

Required hold points

HP-1 · MEP route clearance

Casey confirms the revised route clears the existing fire-alarm device and ceiling congestion.

HP-2 · Permit comment 07

Eli attaches the revised circuit/load note and records the response.

Release history

DraftAug 8 · system
ReviewedAug 9 · Eli
ChangedADD-02
ReleaseWaiting
Human approval required

This package cannot release yet.

Both hold points and the revised allowance must close. Maya Torres is the named release approver.