Synthetic demonstration. Do not enter real client or project data.
Harbor Point (second example) / Preconstruction-to-field handoff
Not released

Field Capture

A MagicPlan-style export, notes, and diagrammatic site evidence become a reviewable existing-condition record.

Open synthetic PDF

Where this starts: a phone walk and an export

Before any of the screens in this workspace exist, somebody stood in the building. magicplan is one common way that walk gets captured, and it is the one shown here. If your crews capture another way, the export changes and nothing else does.

1

Walk the space with a phone

One person, no tripod and no laser. Room by room, plus photos of the conditions that matter: panels, congested ceilings, damage, access.

2

magicplan turns it into a measured export

A report PDF carrying the sketch, the dimensions, your photos, your notes and your own custom forms. A sketch PDF. A DXF that opens in AutoCAD or SketchUp. Claims work can go straight to Xactimate or Cotality.

3

The export lands here

This is the step almost everybody does by hand. Instead of a person retyping the export into an estimate at nine at night, every line arrives with its source attached and a review state.

Drop a magicplan export here

In a live deployment this is where your own export lands. This workspace is a demonstration, so it will not take a real file: never put an actual client project into a demo. Load the synthetic one instead and watch what happens to it.

Your tools stay where they are. The export is the input. Where the reviewed result goes afterward is whatever you already run on, and that is the part worth thirty minutes of talking rather than guessing.

JobberProcoreBuildertrendJobTreadHousecall ProQuickBooksGmailspreadsheets

Area view · east corridor

Needs MEP review
Existing corridor
9'-2" ceiling
Electrical room
panel LP-2
Occupied lobby
protect in place
Service zone
roof access
!

Evidence rail

HP-001East corridor baseline
Diagrammatic synthetic evidence
HP-002Diagrammatic plenum congestion
Diagrammatic synthetic evidence
HP-003Panel LP-2 label
Diagrammatic synthetic evidence
HP-004Fire-alarm device position
Diagrammatic synthetic evidence
HP-005Roof access constraint
Diagrammatic synthetic evidence
HP-006Damaged ceiling grid
Diagrammatic synthetic evidence
LineAreaCaptured conditionSourceOutput consequenceReview
001East corridorCeiling height 9'-2"
Confidence: High
HP-001Existing-condition baselineConfirmed
002East corridorCongested plenum at grid E4-E6
Confidence: High
HP-002Constructability flagNeeds MEP review
003Electrical roomExisting panel LP-2; directory incomplete
Confidence: Medium
HP-003Field verification hold pointOpen
004East corridorExisting fire-alarm device conflicts with new ceiling layout
Confidence: High
HP-004Fire alarm / RCP coordinationOpen
005RoofAccess hatch blocked during occupied hours
Confidence: High
HP-005Access constraint + work-window ruleConfirmed
006East corridorDamaged ceiling grid; 34 LF observed
Confidence: Medium
HP-006Quantity + allowance reviewNeeds quantity check
007Drawing comparisonAddendum 2 reroutes conduit through congested zone
Confidence: High
A3 + ADD-02Electrical scope impactOpen
008Permit reviewAHJ asks for revised circuit/load note
Confidence: High
PC-07Permit response blockerOpen
009Owner decisionAcoustic tile alternate not selected
Confidence: High
OD-04Ceiling release blockerOpen
010Bid coverageFire protection has one qualified proposal
Confidence: High
FP-01Coverage-risk flagOpen

Existing-condition record ready for review

10 facts retain source, area, capture date, confidence, review requirement, affected package, and current state.

Create reviewed scope →