Harbor Point (second example) / Preconstruction-to-field handoff
Not released

Scope & Estimate

Normalized trade lines keep the source, assumption, allowance, exclusion, and review state visible.

View work packages
Scope lines43 affected by ADD-02
Allowances$22,700Illustrative only
Bid coverage1 gapFire protection
Review stateNot approvedHuman review required
CodeTradeNormalized scopeSource basisPricing basisStatus
26-01ElectricalReroute branch conduit above east corridor outside congested plenum zone.A3 + ADD-02$18,400 allowance
Not a verified quote
Revise
28-02Fire alarmRelocate one existing device and verify coverage after ceiling coordination.HP-004 + RCP A3Vendor confirmation
Not a verified quote
Review
09-04CeilingsReplace 34 LF damaged grid; hold affected bay until MEP route is approved.HP-006$3,200 allowance
Not a verified quote
Hold
01-08General conditionsOccupied-hours protection and approved roof-access window.HP-005$1,100 allowance
Not a verified quote
Ready

Inclusions

  • Occupied-area protection
  • Electrical route coordination
  • 34 LF grid allowance

Exclusions

  • Licensed engineering conclusion
  • Permit approval
  • Owner finish selection

Bid packages

  • Electrical · 2 qualified
  • Ceilings · 2 qualified
  • Fire protection · 1 qualified

Example connected workflow

A reviewed proposal could be prepared for the system of record. No message, quote, or invoice is sent from this demo.