Harbor Point (second example) / Preconstruction-to-field handoff
Not released

Control Book

The field and office share one current revision, one release verdict, and one source trail.

Open Addendum 2

Current plan highlight

A3 · not released
East corridor
work package E-04
Electrical room
LP-2 verification
Occupied area
protection ready
Roof access
window open
2

Milestone timeline

Field captureReviewed
ScopeNormalized
Coordination3 holds
ReleaseWaiting

PM controls

Current revisionA3 / ADD-02
Next decisionMEP route clearance
Responsible personEli Brooks
Next releaseElectrical + ceiling

Trade-release matrix

TradePackageHoldState
ElectricalWP-E-042Blocked
Fire alarmWP-FA-021Review
CeilingsWP-C-071Review
General conditionsWP-GC-030Ready

Daily discoveries + sources

  • Plenum congestion confirmed
    HP-002 · Jordan Lee · Aug 8
  • Existing fire-alarm device conflict
    HP-004 · Casey Morgan · Aug 8
  • Panel directory incomplete
    HP-003 · field verification open
Open source ledger

Procurement status

Switchgear lead timeAt risk
Acoustic tile alternateOwner decision
Fire-protection bid coverage1 qualified
Release held

The current book is complete enough to review—not to build.

Field work stays locked until route clearance, permit response, and allowance review are recorded.